Two 160 tph Loesche LM53.3+3 Installation

Location: Martinsburg, WV
Duration: 39 weeks

Vezér Industrial Professionals installed two Loesche Mill 53.3+3 at a brown field cement plant expansion in Martinsburg, WV. The project included installing all finish mill associated equipment and structural steel.

Scope of Work:

  • Mechanical Installation Vertical Mill No.11
  • Mill No. 11 – Feeding System
  • By-Pass System Mill #11
  • Installation Hydraulic System
  • Bucket Elevator for Mill No.11
  • Bag House and Cement Silo feeding System
  • Steel Structure (approximately 2,290 Metric Tons)
  • Mechanical Installation Vertical Mill No.12
  • Mill No. 12 – Feeding System
  • By-Pass System Mill #12
  • Bucket Elevator for Mill No.12
  • Bag House and Cement Silo feeding System
  • Installation of Hot Gas Generator System
  • Miscellaneous Equipment
  • Duct Work Installation (approximately 300 Metric Tons)