2,600 tpd Clinker Cooler Installation

Location: Charlevoix, MI
Duration: 36 weeks

Vezér Industrial Professionals installed the ThyssenKrupp equipment for a complete clinker cooler at a brown field cement plant expansion in Charlevoix, MI. The project included installing all clinker cooler associated equipment and structural steel.

Scope of Work:

  • Installation of intermediate crusher with two fans.
  • Installation of 11 cooling fans for the cooling the cooler compartments
  • All ducts between cooler and the fans and suction ducts for the fans
  • Installation of accessories such as bull nose fan and water injection system which included pump skids, reservoir, piping and the sprinklers.
  • Assembly and installation of heat exchanger
  • Assembly and installation of the cooler bag house
  • Assembly and installation of duct between heat exchanger and bag filter
  • Assembly and installation of bag filter process fan
  • Assembly and installation of duct and equipment between bag filter process fan and bag filter
  • Assembly and installation of ventilation outlet chimney
  • Assembly and installation of bag filters to the three clinker conveyors
  • Assembly and installation of three Beumer pan conveyors
  • Assembly and installation of auxiliary equipment to all main equipment
  • Assembly and installation of platforms to all equipment
  • Complete installation, testing and commissioning of all hydraulic systems.
  • Installation of air cannons for the cooler.
  • Installation of instrumentation piping
  • Complete alignments and reports for all equipment.