Location: Charlevoix, MI
Duration: 36 weeks
Vezér Industrial Professionals installed the ThyssenKrupp equipment for a complete clinker cooler at a brown field cement plant expansion in Charlevoix, MI. The project included installing all clinker cooler associated equipment and structural steel.
Scope of Work:
- Installation of intermediate crusher with two fans.
- Installation of 11 cooling fans for the cooling the cooler compartments
- All ducts between cooler and the fans and suction ducts for the fans
- Installation of accessories such as bull nose fan and water injection system which included pump skids, reservoir, piping and the sprinklers.
- Assembly and installation of heat exchanger
- Assembly and installation of the cooler bag house
- Assembly and installation of duct between heat exchanger and bag filter
- Assembly and installation of bag filter process fan
- Assembly and installation of duct and equipment between bag filter process fan and bag filter
- Assembly and installation of ventilation outlet chimney
- Assembly and installation of bag filters to the three clinker conveyors
- Assembly and installation of three Beumer pan conveyors
- Assembly and installation of auxiliary equipment to all main equipment
- Assembly and installation of platforms to all equipment
- Complete installation, testing and commissioning of all hydraulic systems.
- Installation of air cannons for the cooler.
- Installation of instrumentation piping
- Complete alignments and reports for all equipment.